Skip to main content
07824 159499
info@spraymypad.co.uk
Unit A New Building, Stoke-on-Trent Staffordshire, ST3 1PL

Recent Projects

Case Studies

We’re here to help with your
coatings and refurbishment needs.

Whether you have a question, need expert advice, or want to discuss a project, our team is ready to assist.

Case Study

Pentagon Food Group

Overview:

Refurbishment of a live food manufacturing facility, including internal wall and ceiling spraying, structural steelwork coatings, and specialist surface preparation.

Project Size:

Large-scale industrial refurbishment project

Objective:

• Improve appearance and brightness
• Protect internal assets
• Extend surface lifespan
• Complete works within schedule

Scope:

• Full preparation & cleaning
• Masking of all windows, trims & sensitive areas
• MEWP access for high-level works
• Spray application using specialist commercial coatings
• Multi-coat system for durability & coverage

Challenges:

• Live operational environment
• Strict hygiene standards
• Sensitive equipment protection
• Tight programme deadlines

Solution:

• Careful preparation and masking
• Internal wall and ceiling spraying
• Steelwork coating application
• Durable commercial-grade coatings

Result:

• Cleaner, brighter workspace
• Improved light reflectivity
• Enhanced asset protection

Outcome:

Delivered on schedule with minimal disruption and a high-quality finish.

Case Study

Timmis

Overview:

External refurbishment project involving cladding spraying, steelwork coatings, roller shutter spraying, and façade restoration.

Project Size:

Large-scale industrial facility

Objective:

• Refresh building appearance
• Protect existing assets
• Reduce replacement costs
• Extend asset lifespan

Scope:

• Full preparation & cleaning
• Masking of all windows, trims & sensitive areas
• MEWP access for high-level works
• Spray application using specialist commercial coatings
• Multi-coat system for durability & coverage

Challenges:

• Working at height
• Weather exposure
• Achieving a consistent finish
• Maintaining site operations

Solution:

• Cladding and steelwork coatings
• Roller shutter restoration
• Thorough surface preparation
• Long-lasting protective systems

Result:

• Modernised building exterior
• Reduced refurbishment costs
• Improved weather protection

Outcome:

Completed successfully, providing a cost- effective alternative to replacement with lasting protection.